There are two quotes for a new restaurant. Both include an “SS worktable, 1800 × 750 mm”. These prices vary widely, but both descriptions don't provide the buyer with any clues as to what they are getting. Do you have any space under the shelf? A rear upstand? A reinforced top? Who gets it to the kitchen floor?
One of the most frequent problems with comparing kitchen equipment manufacturers is that it is possible for two different manufacturers to have the same name for their product, but with different specifications and responsibilities. The usefulness of the comparison is only when it's written down.
Have a single specification, rather than three different quotations.
Give a simple bill of quantity (BoQ) prior to asking for quotes. Name of the items, quantities and specifications required must be the same for all suppliers.
Fabricated counters include length, depth, working height, stainless-steel grade (if applicable), thickness of the sheet, shelving, legs and sink and backsplash. When ordering a fryer or refrigerator, inquire about the make and model, the capacity, the utilities and accessories needed, and the usable capacity.
This difference is reflected in public procurement. In a WAPCOS 2025 – 26 kitchen equipment tender, material test certificates were required and the specifications demanded in the BoQ were also to be matched with the kitchen equipment. That contract was subject to those provisions, but they are good examples of the problems with relying on a product label.
Create a line that divides the Factory Price and Installed Price.
Sometimes it may include the quote for the equipment at the factory gate and the buyer's responsibility includes transport, unloading and installation. The other can be about the commissioning and adjustments on site.
Please request these costs be reported separately from your suppliers:
- They are capable of creating and customizing equipment. They can make and modify equipment.
- Packaging, freight and unloading and transporting to the installation site.
- Installation, testing and commissioning.
- Taxes and any work specifically excluded from quote
Indicate who is responsible for connections for gas, electricity, water and drainage. There may be the need for separate qualified contractors for those works. These additions may mean that the equipment will still be cheaper for the buyer, but they must have the entire amount first to make their decision.
Don't use Location to Verify the Project, only to find a Phone Number.
A good place to start is to type in “kitchen equipment manufacturers near me” in a search engine. It can't determine if there's a possibility of the supplier making equipment, reselling different brands or sending its own installation team.
If you are looking at the comparison of kitchen equipment manufacturers in Delhi NCR, a site inspection by the manufacturer may be helpful. While the floor plans of kitchens in Delhi, Noida, Gurugram and Faridabad might be identical, access issues can be quite a bit.
For custom fabrication, check with the manufacturer for door/lift clearance, delivery access and final dimensions of equipment prior to approval. The supplier should also indicate if there are any changes in drawings that need the buyer's approval. No matter how much it costs, a counter that doesn't pass through the service entrance is a costly issue, and it's one that needs to be addressed.
Identify which team takes care of bought-out machines.
A fabricator can produce stainless-steel tables and sinks, as well as other refrigeration, oven/dishwasher products being produced by another company. It's common practice and the responsibility must be transparent.
Include the actual make and model, warranty company, and responsibility and route to replacing the parts for each unit that has been purchased. Are kitchen personnel aware of when a fault has occurred in a refrigerator – do they contact the seller or the original manufacturer/service partner?
As you compare kitchen equipment manufacturers in India, seek these answers in writing – particularly if the project is outside of the manufacturer's home city.
Please get a Compliance Sheet before ordering.
It is useful to add a column to the right of the requested specification of the offered specification and deviations. Book anything that hasn't been confirmed rather than use an ambiguous quotation as a purchase order.
This is in line with FSSAI's published equipment procurement specifications which have tabular compliance statements for food testing laboratory purchases. It is not a restaurant-kitchen tender template that has to be used, but the approach can be applied.
Determine on-site testing/detective correction (as applicable to the project) and drawing approval. Each stage of the purchase order should give the name of the person who approves it.
Prior to the payment of an advance, select the top 5 most significant items in the BoQ and have each bidder indicate an “inclusion”, “exclusion” and “deviation” for each of these items. When the scope is not priced alike by the suppliers, the totals can't be compared.